Technical Specifications & FAQ
The brutal truth regarding solar hardware endurance, CFE interconnections, and B2B wholesale distribution protocols across the Mexican Republic.
Installer / Distribution Logic
How are wholesale tiers calculated?
▼
Pricing discounts trigger linearly at $10k, $50k, and $150k trailing 90-day volume metrics.
Will you drop-ship directly to our trenching site?
▼
Yes, specifically for container-level bulk. LTL freight drops anywhere a standard lift-gate chassis can access.
What happens if a micro-inverter DOA’s?
▼
We buffer 2% DOA stock at local fulfillment holding yards. We swap the hardware physically within 48 hours for authorized Tier-1 installers before forcing Chinese manufacturer RMAs.
End-User / Homeowner Grid Reality
Does salt air ruin the panels?
▼
The panels do not inherently rust. The racking absolutely will. If your installer utilizes galvanized steel off the Sea of Cortez, the system will rip off the roof in 5 years. We strictly supply 6005-T5 Anodized Aluminum.
Is a local CFE bribe required for the meter?
▼
Historically, yes. However, by running your Contrato de Interconexión through our vetted engineering firm, we bypass local bottlenecks at the federal level, removing unethical “Notario/Local” drag times natively.
Can the CFE legally disconnect me if I add solar?
▼
If you do not register the array, yes. Using a certified Expertos Solares partner ensures the system is federated legally. Your connection is perfectly protected by law.



